MELAMCHI, June 25: A temporary bridge in Melamchi Municipality-11 was damaged by flood water last night.
A hump pipe was installed as a temporary bridge after the concrete bridge over the Melamchi river was washed away by the floods in July last year. A local, Dasharath Danuwar, said that the road was closed after the temporary bridge was damaged.
Vehicular movement affected as temporary bridge over Melamchi i...
Locals of six wards in the municipality have been affected as a result of the disruption in vehicular movement.
Meanwhile, locals around Helambu and Melamchi left their homes and went to safer grounds at midnight fearing possible floods. Prabha Bhandari of Helambu-2 said that she left home at 12 pm and went to an area with higher elevation in order to save herself from the possible flood.
(RSS)