header banner

Barpak-Laprak road resumes

alt=
By No Author
GORKHABAZAAR, May 25: The Barpak-Laprak roadway which was obstructed by the landslides triggered by the rainfalls resumed this morning.

The team of Nepal Army deputed at Barpak cleared the obstructions and brought the road into operation. There were hundreds of small landslides along the 20km road.


With the resumption, seven stranded tractors have headed to Laprak to supply the relief materials.

Another local roadway from Gopsidanda-Gumda of Laprak blocked by the landslips was brought to operation by the locals.

After the April 25 earthquake created large fissures in the areas around Laprak and Barpak, landslides are frequent with rainfall. RSS



Related story

Kathmandu Road Division Office starts blacktopping road demolis...

Related Stories
SOCIETY

Construction of six-lane road still incomplete, si...

vairawa_oct25.jpg
SOCIETY

Traffic resumes after repair of collapsed road in...

1726373366_kupandol-1200x560_20240915103601.jpg
SOCIETY

Road safety draft gathering dust at the Ministry o...

MinistryofInfrastructure_20220710121933.jpeg
ECONOMY

Nepalgunj-Kohalpur road expansion stalled for four...

nepalgunj_kohalpur-1200x560_20220819144401.jpg
ECONOMY

Mailung-Syafrubesi road to come into operation in...

blasting.jpg