Tanahun, June 29: The obstructed Prithvi Highway has resumed following the removal of landslide debris near Aina Pahara at Aanbukhaireni-2 in Tanahun district. A dozer was deployed to clear the landslide deposition, said the Area Police Office, Aanbukhaireni.
The road was obstructed by the landslip in the area, resulting in scores of vehicles heading to their destinations getting stuck midway, said the police. The road leading to Gorkha through Mugling and Aanbukhaireni reopened after the road was cleared.
Prithivi Highway faces routine obstruction from mudslides
“But, traffic on the obstructed road leading to Pokhara is yet to resume as the removal of debris is underway,” Police said. "The obstructed road too will reopen soon."
(RSS)