Musikot-Rukumkot road resumes

Published On: September 12, 2018 04:03 PM NPT By: Republica  | @RepublicaNepal


MUSIKOT, Sept 12: The Musikot-Rukumkot section of the Mid-hills highway which had remained disrupted for long time due to landslide at multiple places along the section has resumed. 

The road section was damaged at different points owing to the landslide with the start of the rainy season. The road has been repaired and vehicular movement has resumed. The road connects Musikot of West Rukum and Rukumkot of East Rukum. 

Sisne rural municipality chairperson Kumari Baral said that the road section has been repaired and traffic resumed with the rain subsiding since some days back.

RSS


Leave A Comment