SOCIETY

Nepali Army restores Nuwakot’s Tadi River crossing with 57.9-metre acrow bridge after floods

The Army installed a 57.9-metre-long and 5.5-metre-wide Advanced Modular Panel Bridge (Acrow Bridge) at Devighat in Nuwakot-5. The bridge has a maximum load-bearing capacity of 60 tonnes.
alt=
By REPUBLICA

KATHMANDU, Sept 10: The Nepali Army has installed a new acrow bridge over the Tadi River at Devighat in Nuwakot as part of ongoing efforts to rebuild roads and bridges damaged by the devastating Bhotekoshi flood on August 26.



The Army installed a 57.9-metre-long and 5.5-metre-wide Advanced Modular Panel Bridge (Acro Bridge) at Devighat in Nuwakot-5. The bridge has a maximum load-bearing capacity of 60 tonnes.


Related story

Lower Tadi Hydro project begins


According to the Nepali Army, the road has been reopened following the installation of the bridge.


The reopening is expected to ease travel for residents of Nuwakot and surrounding areas, while improving vehicular movement and facilitating relief and rescue operations and the transportation of essential supplies to flood-affected areas.

https://republicaimg.nagariknewscdn.com/shared/web/uploads/media/ea8eb36d-26fb-42d1-9f3f-18f6d4050469-1789103109.webp
Related Stories
SOCIETY

Crossing Mahakali on risky Tuins continues to kill...

1595499295_tuin-1200x560_20210809150914.jpg
POLITICS

NC wins elections at Tadi Rural Municipality-1

NC wins elections at Tadi Rural Municipality-1
SOCIETY

Unsafe zebra crossing

Unsafe zebra crossing
SOCIETY

Youth falls into Mahakali while crossing the river...

1627717583_tuin-1200x560_20210731161856.jpg
SOCIETY

Bridges replace Dhading’s risky tuins

bridges.jpg