KATHMANDU, May 25: The Kali Gandaki 'A' Hydropower Project, that had halted power generation to avert possible damage after massive landslide at Ramche of Myadgi blocked Kali Gandaki river, resumed power generation on Monday.
The 144 Megawatts capacity project resumed operation after 27 hours.