September 5, 2022 16:16 pm
KATHMANDU, Sept 5: The 132 kV double circuit transmission line from Yogikuti (Butwal) to Mainahiya, built for reliable and quality power supply, increase transmission capacity and control technical leakage in the Bhairahawa area of Rupandehi, has been inaugurated.
July 7, 2022 13:55 pm
KATHMANDU, July 7: A 132 KV double circuit transmission line from Yogikuti, Butwal to Mainahiya has come into operation to improve power supply and control technical leakage in the Bhairahawa area of Rupandehi.