KATHMANDU, June 11: The Nepal Electricity Authority (NEA) has incurred an average loss of Rs six million after a mentally unstable man climbed on the overhead high electrical line in Nuwakot. According to NEA, it has to bear such a loss as the Upper Trishuli 3A Hydropower Project had to shut down after this incident.