KATHMANDU, June 11: The Nepal Electricity Authority (NEA) has incurred an average loss of Rs six million after a mentally unstable man climbed on the overhead high electrical line in Nuwakot. According to NEA, it has to bear such a loss as the Upper Trishuli 3A Hydropower Project had to shut down after this incident.

KATHMANDU, June 11: A mentally unstable man has been walking on electric cables since 10AM this morning in Nuwakot. The local people as well as police have been surprised by this incident.