header banner
SOCIETY

Road linking Ghyaasikhark and Lulang reopens after four months

Vice-chairperson Resham Pun Magar of Dhaulagiri Rural Municipality mentioned that with the cessation of rains, the water levels have receded, allowing for the resumption of transport on the road to Lulang through the installation of a hump pipe. 
alt=
By REPUBLICA

MYAGDI, Oct 23: The transportation route between Ghyaasikhark in Raghuganga Rural Municipality-8 and Lulang in Dhaulagiri Rural Municipality-2 is back in operation after being shut for four months. 



A landslide in Malang, located in Chimikhol of Raghuganga Rural Municipality-7, along with rising water levels in the Darakhol area of Dhaulagiri Rural Municipality-2 during the monsoon, had blocked access to Lulang since the month of Asar (June). 


Related story

Waribeni-Mallaj linking road project completed before deadline


Vice-chairperson Resham Pun Magar of Dhaulagiri Rural Municipality mentioned that with the cessation of rains, the water levels have receded, allowing for the resumption of transport on the road to Lulang through the installation of a hump pipe. 


The lack of a motorable bridge over the river often disrupts transport between Lulang and Gurja villages during the rainy season. Additionally, after utilizing bulldozers to clear landslides in Malang, with assistance from the Chimkhola–Rahughat–Mangle, Thulakhola, and Upper Thulakhola Hydropower Projects, the road connecting Chimkhola to Ghyaasikhark has also reopened. 


Local officials have confirmed that all roads, including those in the remote areas of Myagdi such as Ghyaasikhark and Lulang, which were obstructed during the rainy season, have been repaired, restoring transportation. With the roads now operational, rural residents find it easier to travel, transport construction materials and food grains, and market agricultural and livestock products.


RSS

Related Stories
ECONOMY

2,787 electrical four-wheelers imported in four mo...

electricvehicle_20220812135005.jpg
SOCIETY

Kathmandu Road Division Office starts blacktopping...

Balen,roaddivision_20240603125723.jpg
SOCIETY

Construction of road linking Katunje to Hetauda be...

Roadconstruction_20210411185443.jpg
SOCIETY

Agro tourism road linking three local levels black...

Agro tourism road linking three local levels blacktopped
SOCIETY

Disrupted road linking tourist destination, Letang...

Disrupted road linking tourist destination, Letang opens