HIMNATH DEVKOTA
HIMNATH DEVKOTA
Latest
ECONOMY
Redesign of Rasuwagadhi ICP misses deadline
Redesign of Rasuwagadhi ICP misses deadline
RASUWA, August 8: The redesign of the Integrated Check Post (ICP) under construction at Rasuwagadhi, a trade gateway with China, has missed its deadline. Yogendra Tumbahangphe, Project Manager of Shyam Sundar Rabina JV Construction, said that 55 percent of the work has been completed so far but the...
Aug 08, 2021
SOCIETY
Gosainkunda becomes first rural municipality in Bagmati to fully vaccinate locals against...
Gosainkunda becomes first rural municipality in Bagmati to f...
RASUWA, August 4: Gosaikunda Rural Municipality has become the first rural municipality in Bagmati Province to fully vaccinate locals against COVID-19.
Aug 04, 2021
ECONOMY
Import of electromechanical equipment stuck in China for months due to lockdown resumes
Import of electromechanical equipment stuck in China for mon...
RASUWA, April 12: The import of electromechanical equipment meant for the Upper Sanjen Hydroelectric Project, which is under construction in Rasuwa, has resumed after several months.
Apr 12, 2021
ECONOMY
Fixed rates set for hotels operating in Gosaikunda trekking trail
Fixed rates set for hotels operating in Gosaikunda trekking...
RASUWA, April 8: For the first time in the recent history, hotels operating on the Gosainkunda trail have agreed to set a fixed rate for their services. The rates have been fixed for hotels, lodges and tea shops operating in the park and intermediate areas at the initiative of Langtang National Park...
Apr 08, 2021
ECONOMY
340,000 tourists visit Langtang National Park in 42 years
340,000 tourists visit Langtang National Park in 42 years
RASUWA, March 30: Over 340,000 tourists have visited the Langtang National Park in the past 42 years, according to the statistics maintained by the Park Office.
Mar 30, 2021
ECONOMY
32 bridges to be constructed along road section connecting Rasuwagadhi within a year and a...
32 bridges to be constructed along road section connecting R...
RASUWA, Feb 27: A total of 32 bridges will be constructed along the Galchhi-Syafru road section connecting Rasuwagadhi, an international trade gateway with China. The bridges will be completed within a year and a half. Currently, work is underway to upgrade the road from Galchhi to Syafru through Ma...
Feb 27, 2021
ECONOMY
Export of Nepali goods via Rasuwagadhi transit point still remains suspended
Export of Nepali goods via Rasuwagadhi transit point still r...
KATHMANDU, Feb 1: The export of Nepali goods via Rasuwagadhi, an international trade gateway with China, has been suspended for a year and a half now.
Feb 01, 2021
ECONOMY
Upgradation of Syafru-Rasuwagadhi road section to begin from April
Upgradation of Syafru-Rasuwagadhi road section to begin from...
RASUWA, Jan 7: The upgradation work of the Syafru-Rasuwagadhi road section connecting Rasuwagadhi checkpoint will start from April.
Jan 07, 2021
ECONOMY
Upgradation of Syafru-Rasuwagadhi road section sees inordinate delay
Upgradation of Syafru-Rasuwagadhi road section sees inordina...
RASUWA, Dec 21: The upgradation of Syafru-Rasuwagadhi road section connecting Rasuwagadhi checkpoint has not started yet. The work has not seen any progress as the Nepali side has been delaying the process.
Dec 21, 2020
SOCIETY
A 6-year old girl killed after abduction in Rasuwa
A 6-year old girl killed after abduction in Rasuwa
KATHMANDU, Dec 9: A girl has been killed after being abducted in Rasuwa. Sumina Tamang, a 6-year-old girl of Phailigang in Kalika Rural Municipality- 1 of the district, was killed after being abducted. She was attending Grang Primary School and had gone missing since Sunday after she left for school...
Dec 09, 2020