TAPLEJUNG, April 4: The tunnels of the under-construction hydropower project in Sirijanga Rural Municipality of Taplejung, have started achieving breakthroughs one after another. The Headrace Tunnel (HRT) of the Kabeli-3 hydropower project, with a capacity of 21.93 MW, has achieved a breakthrough.