ILAM, Sept 25: The much-hyped Visit Nepal 2020 is just three months away but most of the roads leading to major tourist destinations are yet to be repaired. The situation is not different in Province 1, which boasts of having over two dozen tourist destinations.

JUMLA, Aug 17: Sher Bahadur Bohora of Jumla recently traveled to Surkhet last week. That was not the first time he made the trip. However, he was never scared as he was on that trip. ‘That was not a journey, it was a nightmare’.

DHADING, Feb 12: Priskala Tamang of Khaniyabas Rural Municipality-2 is very happy after her village recently got connected with the road network. Previously, the small settlement in the north of Dhading district was totally dependent on mules to transport essentials like food and construction materials.

ROLPA, Jan 28: Construction of roads was always the major demand of the people in Rolpa's villages and towns. This was what they asked for with the candidates during the last local level election.

RASUWA, Sept 30: With the arrival of Dashain, the greatest festival of Hindus, local units are gearing up to resume vehicular movement on various rural roads, which were obstructed due to landslides caused by torrential rain.