header banner
SOCIETY

Kaligandaki corridor: Blacktopping begins at Lasti-Beni section

This is the main road connecting Maldhunga-Beni and Mustang to the national highway. 
alt=
By Republica

MYAGDI, Nov 13: The Lasti-Beni section under the Kaligandaki corridor is being blacktopped. 



This is the main road connecting Maldhunga-Beni and Mustang to the national highway. 


Related story

Revised interest rate corridor system introduced


Information Officer of the Beni-Jomsom-Korola Road Project, Engineer Bishnu Chapagain shared that the road from Farse to Beni is being blacktopped today. 


'Two kilometers of paving has been already completed in the landslide affected areas along the 13-km-long Maldhunga-Beni road', he informed. 


Earlier, blacktopping was carried out in five kilometers from Kushma Municipality-1, Maldhunga to Jaljala Rural Municipality-8, Nagliwang, Farse under the Maldhunga–Beni road. 


A contract of Rs Rs 528.6 million was signed in Chaitra 2077 BS to widen the Lamdhunga-Beni road to 11 meters and pave and blacktop it using asphalt technology. 


RSS

See more on: Kaligandaki Corridor
Related Stories
SOCIETY

Landslides blocks Kaligandaki corridor

Kaligandakiroadcorridor_20230630122433.jpg
SOCIETY

Access road connecting Kaligandaki Corridor to be...

Access road connecting Kaligandaki Corridor to be paved
ECONOMY

Access road connecting Kaligandaki Corridor to be...

Kaligandaki-Corridor.jpg
SOCIETY

Landslides blocks Baglung section of Kaligandaki C...

1675096872_1631262716_Pokhara-BaglungRoad-1200x560-1200x560_20230131140023.jpg
ECONOMY

85 percent work completed on Beni-Jomsom-Korala se...

1679041482_Beni-JomsomRoad-1200x560_20230317175739.jpg