Obstructed Narayangadh-Mugling road opens after 12 hours

By No Author
Published: June 18, 2017 02:36 PM

CHITWAN, June 18: The Narayangadh-Mugling road section that was obstructed by a landslide opened today morning after around 12 hours.

The road resumed for traffic following the removal of the debris at Kalikhola, 2.5 kilometers towards Narayangadh from Mugling, said Shiva Khanal, engineer at the Narayan-Mugling road project.

It took long time to clear the debris as the landslide was big, he added. An excavator, two loader and three tipper trucks were used for the clearance. RSS