RASUWA, Nov 19: Prime Minister KP Sharma Oli and Minister for Energy, Water Resources and Irrigation Barsaman Pun jointly inaugurated the Upper Trishuli 3A hydropower project on Monday.

RASUWA, Aug 3: Additional 30 megawatt of Upper Trishuli 3A has been connected to the national transmission line. According to Fanindra Joshi, chief of the project, total 60 megawatt of the project has been connected to the system including the 30 megawatt added Friday morning.