KATHMANDU, Aug 6: The third section of the transmission line of strategic importance, Kabeli Corridor Transmission Line, has finally come into operation by overcoming decades-long disputes.

KATHMANDU, Dec 22: Three hydropower projects, which are in their final stages to generate power, would face problem in lack of attention of the Nepal Electricity Authority in the construction of Kabeli Corridor Transmission Line.

KATHMANDU, March 27: Butwal Power Company (BPC) Limited has formally started work of two hydropower projects -- Kabeli 'A' Hydroelectric Project (37.6) located on the Kabeli River and Nyadi Hydropower Project (30 MW) located on the Nyadi River.