RASUWA, Aug 21: Rasuwagadhi Hydropower Project (111 MW) achieved breakthrough in tunnel digging on Monday. The breakthrough was achieved after workers of the 2,303-meter second audit dug through to the 1,882-meter third audit of the 4,185-meter tunnel of the hydropower project on Monday, according to project officials.