Published On: March 25, 2018 05:45 PM NPT
KATHMANDU, March 25: Power outage does not exist in any part of the country except in industrial corridor, the Nepal Electricity Authority has said.
Stating that power cuts due to technical problems cannot be called as load shedding, the NEA has said that power supply has been deducted for three hours in industrial corridors but there has been regular supply to individual homes.
"Power supply sometimes faces problem due to the technical problem including in the transmission and distribution system, which used to take place in the past as well," NEA Executive Director Kulman Ghising said. The NEA is working to address them as well as soon as possible. RSS
KATHMANDU, Feb 2: Nepal Electricity Authority (NEA) Managing Director Kulman Ghising has warned that the electric utility could cut off... Read More...
KATHMANDU, Dec 21: Nepal Electricity Authority (NEA) has clarified that there would be no load-shedding except the technical problem. ... Read More...
KATHMANDU, Dec 5: Nepal Electricity Authority (NEA) has said that it won't impose power cut in the Kathmandu Valley at least... Read More...
Leave A Comment