Repair of fire-damaged Trishuli Hydel center begins

Featured image related to the news article
By Republica

BETRAWATI, Nuwakot, Jan 4:  Repair of the power house of the Trishuli Hydropower Center destroyed in a fire has started. 

An 18-member team of technicians and officials from the centre has been assigned to repair the house, said the centre chief Taradatta Bhatta, adding that it will take at least a week to complete the repair. "Repair is expedited by dividing the team into two groups." 

The 14-Megawatt Devighat Hydropower Center and the 21-Megawatt centre came to a halt after the fire destroyed the power house on Wednesday evening. 

RSS